THE LINUX FOUNDATION PROJECTS
Docs navigation
On this page

    3.1.4 Allocated Resource Name

    Dataset: Cost and Usage
    Column Type: Dimension
    Feature Level: Conditional
    Data Type: String
    Since: 1.3

    The Allocated Resource Name is a display name which cost is being allocated to in a Data Generator-Calculated Split Cost Allocation. The Allocated Resource Name is used to understand what the cost is being allocated to in charges where the service provider is allocating costs to something other than the charge's ResourceID, as is the case for allocated charges.

    3.1.4.1 Requirements

    AllocatedResourceName MUST adhere to the following requirements:

    • AllocatedResourceName MUST be of type String.
    • AllocatedResourceName MUST conform to StringHandling requirements.
    • AllocatedResourceName MUST adhere to the following nullability requirements:
      • AllocatedResourceName MUST be null when AllocatedResourceId is null.
      • AllocatedResourceName MUST NOT be null when AllocatedResourceId is not null.
    • AllocatedResourceName MAY duplicate AllocatedResourceId when a separate display name is not applicable.

    3.1.4.4 Description

    The display name of the object to which cost is allocated in data generator-calculated split cost allocation.

    Constraints

    Property Value
    Column Type Dimension
    Feature Level Conditional
    Allows Nulls Yes
    Data Type String
    Value Format \<not specified>